Now showing 1 - 6 of 6
Loading...
Thumbnail Image
Publication

The solar photovoltaic feed-in tariff scheme in New South Wales, Australia

2013, Martin, Nigel, Rice, John

Solar Photovoltaic (PV) electricity systems are part of Australia's energy supply matrix. In the case of New South Wales (NSW), the state government has had to deal with a complex policy problem. In order to play its role in the federal Small-scale Renewable Energy Scheme, the NSW government initiated the 7 year Solar Bonus Scheme in 2010. However, in attempting to maximise community investment in small-scale solar PV systems, it relied on faulty financial modelling that applied a generous Feed-in Tariff (FiT) and underestimated the level of investor participation and installed capacity. Consequently, the scheme has resulted in very high public costs that will require policy changes that bring investors and energy retailers into conflict, and unpopular electricity retail price adjustments. This paper uses a structured case and stakeholder analysis to critically analyse the FiT policy, while also highlighting important lessons for policymakers engaging in FiT design.

Loading...
Thumbnail Image
Publication

Sustainable Development Pathways: Determining Socially Constructed Visions for Cities

2014, Martin, Nigel, Rice, John

The Sustainable Development (SD) of capital and regional cities is one of the most pressing challenges facing Australia. In this study, we analysed the collective views of 226 individuals and public and private organizations to determine SD pathways for cities. Our analysis of 1712 stakeholder statements showed that deficiencies in infrastructure investment, climate change resistant and environmentally harmonized developments, integrated transport networks, land use patterns and SD governance present ongoing challenges and opportunities for governments and communities. Critically, our analysis suggests that an estimated A$400-755 billion infrastructure underinvestment over past economic cycles, tight financial conditions and noted shortcomings in multi-level SD governance will likely see pathway realizations delayed by several years into the future.

Loading...
Thumbnail Image
Publication

Sustainable Development Planning: A Case of Public Participation using Online Forums

2014, Martin, Nigel J, Rice, John, Lodhia, Sumit K

Public participation in Sustainable Development Planning (SDP) of cities represents significant challenges to governments and private organizations responsible for developing infrastructure. In this study, a regional government used a series of electronic discussion papers and questions to enable online forum discussions and exchanges between 196 participants on the major SDP issues related to city development up to 2030. This study used a rigorous and structured QSR NVIVO analysis of 690 online forum postings to determine the participants' major SDP concerns for the city over a 20-year period. The collective results of the investigation show that future integrated transport networks, higher density residential and commercial land use, and sustainable population growth are still the subject of concern and intense debate among forum participants, SDP experts and the government. The research also demonstrates the capacity of green information and technology systems to serve as important mechanisms for SDP participation and consultation.

Loading...
Thumbnail Image
Publication

Developing renewable energy supply in Queensland, Australia: A study of the barriers, targets, policies and actions

2012, Martin, Nigel J, Rice, John

The Australian Government has set an ambitious target that at least 20 per cent of Australia's electricity needs will be met by Renewable Energy (RE) sources by 2020. Given the limited use of RE sources for electricity generation, this national Renewable Energy Target (RET) leaves state, territory and municipal governments in a challenging policy position. In this article, we examine the Australian state of Queensland where RE provides approximately 4 per cent of the region's electricity supplies. The research utilizes stakeholder theory to examine the developmental barriers, targets, policies and actions identified by firms and stakeholder organizations in the RE industry sector. The results from our analysis show that RE developments face a range of socio-technical barriers that require timely actions in the areas of financial incentives, infrastructure enhancement, regulation reform, community-centred developments, technology and workforce investments, and information and education programs. Also, in the context of RE planning, while the national RET is the preferred setting, the differences between Queensland's RE installed generation capacity and electricity supply targets require clarification and agreement.

Loading...
Thumbnail Image
Publication

Rebalancing Climate Change Debate and Policy: An Analysis of Online Discussions

2014, Martin, Nigel, Rice, John

Public participation in environmental policy development offers governments and private organizations opportunities to gather community views and test policy instruments and solutions. In this study, a concept mapping analysis of 1702 online comments from 344 individuals has been undertaken to determine the balance between climate change debate and policy development, and some of the major issues surrounding policy implementation. The results show that counterproductive and intolerant climate science debate, opposing political party policy alignments, and disagreement on policy implementation serve as impediments in developing workable climate change policy. The research also exposes how individuals can 'hijack' the online discussion forums in attempts to further their own agendas. This suggests that online forums might be better designed to integrate with the larger policy development system.

Loading...
Thumbnail Image
Publication

Extended Producer Responsibility for waste televisions and computers: A regulatory evaluation of the Australian experience

2017, Lodhia, Sumit, Martin, Nigel, Rice, John

High annual volumes of television and computer waste presents a challenge to Australian communities, resulting in the development of Extended Producer Responsibility (EPR) legislation. This study aims to establish, through the use of public interest theory, whether EPR legislation in Australia was in the public interest. Using a regulatory analysis, the results show that during the first 3 years of the scheme, over 130 liable parties joined co-regulatory arrangements each year to fund upstream recycling services for television and computer waste. In program terms, the scheme has been highly successful recycling over 130,000 tonnes of metals, leaded and non-leaded glass, plastics and other materials while limiting landfill transfers to approximately 6900 tonnes, all at a cost of A$50-60 million per annum to producers. The scheme has also seen a range of upstream recycling partnerships established between the co-regulated administrators and formal technical and social enterprise waste management organizations. However, while the upstream material recovery rate is steady at approximately 95%, the results suggests that exporting waste for downstream processing will continue in the future. Analysis also points to substantial funding for 'over target' collections, downstream recycling infrastructure and landfill diversion strategies as critical for averting severe environmental impacts from e-Waste dumping. The study concludes by suggesting that while the successes of EPR scheme are in the public interest, its potential deficiencies could limit such benefits and therefore need to be addressed. Notably, the scheme could be enhanced through the application of improved recycling target methodologies, including the estimation and forecasting of domestic Waste Electrical and Electronic Equipment (WEEE) stock levels.